<p>Since Yujiang built hydropower station 20 years ago, resulting in the rise of water levels in the river, this original field became a swampland, slightly modified for fish pond use, can be used for fish and duck. Transportation is very convenient, direct to cement road, less than 10 km from the high-speed exit, water depth is estimated to be 2-3 meters. Next to the drylands can also be rented together, drylands price 900-1000 yuan/mu per year. </p>
查看全部