1. Reservoir water is abundant, below the power station, four seasons power generation. 2. Convenient transportation, 3.5 m hardened road to power station, full 3.8 m wide sand road through the reservoir, the reservoir environment elegant, water is the source of pure natural spring water, about 4 km from the village, easy to manage. 3. There are only small fish boats and bungalows on the reservoir, power is connected. 4. Water area of about 500 acres, has been put in a seedling section of 100,000 yuan; take over the fish directly. 5. The transfer of the reservoir is until the end of 2025 (6 years), and the contract can be renewed upon expiration. 6. Total transfer contractions cost $260,000, paid once.
查看全部