Specific requirements are as follows:
1, land chain, clear
2, good soil, rice and wheat for two seasons.
3, good traffic conditions, at least the road, water, power
4, the location should be able to avoid waterboarding phenomenon.
5. Clear land title can provide proof.
6, with a larger area of house water field for rent (>300 flat), and related subsidiary sites
查看全部