The land is in a strip shape.PH between 6.5-7.5. Plenty of light. Cement hardened roads.The status of land is reformed, it is expected to be completed in a month and a half, the land is in the form of terraces, and the land will be consolidated into Daejeon.The land is poorly accounted for, it can be bulldoed, or as required by the contractor at this stage.About 50 minutes by car from Bazhong City.Within 5—10 minutes by car from the town.