The land is streaky, terraced.Cement roads.PH between 6.5-7.5. Lumines.Cement hardened roads.The current status of land is reformable, it is expected to be completed for a month and a half, the land is in terraced form, and the land will be consolidated into Ota.The land is less than one metre short and can be bulldozed or modified as requested by the contractor at this stage.It is about 50 minutes by car from Ba'Zhong City.Within 5—10 minutes by car from the town of Field.