1 .<p><strong>Land and construction area project covers a</strong></p> <p>total area of 20,000 square meters (30 acres), the building area of 8319 square meters, of which the plant is 7481 square meters; office buildings 837 square meters; villas 558.8 square meters; construction density 45.6%, volume rate: 0.95, green rate: 17%.A class of industrial land.</p> <p><strong>Second, plant, plant, office building situation the whole plant floor</strong></p> <p>hardened 4000 square meters, reserved green area 6500 square meters, the factory area has 12 meters wide road surround.The plant is 7481 square meters, span 42 meters, length 175 meters, installed 10 tons of electric cranes, 6 units; office building (refined) a total of two floors, 427 square meters, the second floor 410 square meters, the building has 50 square meters of sun recreation area (flower fish bird) and a 50 sqm employee recreation hall.</p> <p><strong>IV. The investment</strong></p> <p>project has a total investment of 15.5 million yuan.Of this, land cost 1 million yuan, construction cost 14.5 million yuan, (plant (office building) construction cost 1467 yuan per square meter).At the end of January 2008, all of the above-mentioned projects were completed and various licenses were fully completed.</p> <p><strong>V.</strong><strong>Investment Intent </strong></p> <p>1, the overall sale, not taking into account the present value assessment, the sale price is set for 14.5 million yuan.</p> <p>2, overall rental, rental is set for 12 yuan per square meter per month (not to bear any costs) <p></p> </p>
查看全部